This project consists of repairs from the dump to the walls and the floors. This was initially caused by the blocked gutters which resulted in walls being prolongedly exposed to the streams of water. The kitchen was completely stripped and dried, and chemical damp treatment was injected into the walls. Some other affected walls and ceilings were opened as well. After curing the cause we will start building the floor
£700k
+£15k